The surface must be solid, free of dust, moisture, and loose particles.
2
Primering
Apply a primer coat to the prepared surface using a roller or brush. After 6 hours, you can proceed with applying the decorative coating.
3
1st Layer Preparation
Pour 900 ml of water into the bucket from the package and add 2.5 kg of loose component. (360 ml of water per 1 kg of mixture). Mix the mixture thoroughly and let it stand for 5 min., then mix again.
4
1st Layer Application
Apply the mixed coating evenly over the prepared surface. The first layer serves to level the surface and as a base for decoration.
5
Drying
Let the first layer of coating dry for 24 hours.
6
2nd Layer Preparation
In a clean bucket, pour 900 ml of water and add 2.5 kg of the dry component (360 ml of water per 1 kg of mixture). Mix thoroughly and let it stand for 5 minutes, then mix again.
7
2nd Layer Application
Apply using decorative techniques such as “pulling” and “spreading.” The second layer creates an uneven concrete relief. After a short setting time (15-30 min.), the surface can be further finished by “smoothing.”
8
Drying
Allow the second layer to dry for 24 hours.
9
Highlight Layer Preparation
Prepare the highlighting coat by pouring component 3/B into component 3/A and mixing thoroughly for 3 minutes. If you are not using the full amount, mix at a weight ratio of 0.9 A : 1 B.
10
Highlight Layer Application
Apply the mixed solution with a velour roller onto the cured coating. Maintain a consumption rate of 0.1-0.15 kg/m². Thoroughly work the highlight into the surface relief. Apply a second layer after approximately 40 minutes. Always prepare a fresh mixture of the highlight according to the previous step.
How to apply the product
1
Surface Preparation
The surface must be solid, free of dust, moisture, and loose particles.
2
Primering
Apply the primer to the prepared surface using a roller or brush. After 6 hours, proceed with the application of the putty.
3
1st Layer Preparation
Pour 900 ml of water into the bucket from the package and add 2.5 kg of the dry component (360 ml of water per 1 kg of mixture). Mix thoroughly and let it stand for 5 minutes, then mix again.
4
1st Layer Application
Apply the mixed coating evenly over the prepared surface. The first layer serves to level the surface and as a base for decoration.
5
Drying
Let the first layer of coating dry for 24 hours.
6
2nd Layer Preparation
In a clean bucket, pour 900 ml of water and add 2.5 kg of the dry component (360 ml of water per 1 kg of mixture). Mix thoroughly and let it stand for 5 minutes, then mix again.
7
2nd layer Application
Apply using decorative techniques such as “pulling” and “spreading.” The second layer creates an uneven concrete relief. After a short setting time (15-30 min.), the surface can be further finished by “smoothing.”
8
Drying
Allow the second layer to dry for 24 hours.
9
1st Sealing Layer Application
Apply the sealing coat evenly over the entire surface using a roller. Apply at a rate of 0.2 kg/m², ensuring that the coating does not run down the wall but is absorbed into the substrate.
10
2nd Sealing Layer Application
After 6 hours, apply the second layer of the sealing coat in the same way as the previous step. The second layer will create a slightly glossy surface. If you prefer a more matte finish, do not apply the second layer.